The first part from Athens to Korinth of the A8 are ready and have 3+3 lanes incl. emergency lanes. From Korinth to Patra any parts are ready and any parts will be build until 2011 with 2+2 lanes and emergency lanes. The largest part of this motorway is build with new jersey blocks.
The facts of the new part
Korinthos-Patra:
- 120 km
- 26,5 m wide
- 4 lanes + 2 emerg.
- Rio-Patra 8 lanes
- 10400m Tunnel
- 61 Bridges 20-4500m
- 13 Interchanges
- 135 Passbridges
- 3400m Cut and Cover
The A8 from Athens to Patra is about 224 km long.
|