HOME to GREEK-MOTORWAY.NET

A1

AEGEAN

A2

EGNATIA

A3

CENTRAL

A5 A6 A7

IONIAN

ATTIKI ODOS

MOREAS

A62 A64 A65 A642
A8

PATHE

A9

OLYMPIA

A25

KASSANDRA

A27

FLORINA

A29

KASTORIAS

A52

AMVRAKIA

.Motorways A3
A3 North button

A3 MAP NORTH

A3 South button

A3 MAP SOUTH

STRETCHING:

From Lamia in the Prefecture of Fthiotida to Panagia in the Prefecture of Trikala

PROJECT SIZE:

231 kilometres

SERVING THE REGIONS OF:

Fthiotida - Karditsa - Trikala

CENTRAL GREECE AXIS A5 (E65)

231 km Motorway from Lamia to Panagia

3+3 LANES AND EMERGENCY-LANE

  • 23 JUNCTIONS
  • 6 SERVICE STATIONS
  • OVER 10 km TUNNEL
  • 620m CUT & COVER
  • 2500m CUT-BRIDGES
  • 6300m CABLE-BRIDGES
  • NEW SUPPORT-ROADS IN THE REGIONS
Greec A3 Map2

Cintra-led Hellenic Autopistas signs E65 DBFM

11 June 2007

Hellenic Autopistas - a consortium comprising Cintra (33.34%), ACS Group (33.33%) and GEK (33.33%) - signed the 30 year concession with the Greek Government for the Eu1.5 billion E65 central Greece motorway DBFM on 31 May.

BBVA, EFG, Fortis, Caja Madrid, Piraeusbank and Santander are providing financing which comprises Eu950 million in

 Review of tariffs: Annually in line with CPI
 Estimated construction period: 66 months
 Start-up: Expected for the end of 2009 when the part of the road to be built by the government is transferred.
 Tolling system: Barrier system, the Central Greece segment will have four toll plazas on the main road and various lateral toll plazas; the Pathe segment will have two plazas on the main road and various lateral toll plazas.
 Consortium: GEK Group (33,33%), Cintra (33,34%), Grupo ACS  (33,33%)

.